Pool Permit and HOA Approval Process Explained
Part 5 of 10: Pool Ownership 101
Permitting and HOA approval are two separate processes that often run in parallel, and confusing one for the other is a common source of project delays. Riverstone and First Colony both require architectural control committee approval for pool and backyard plans, including review of fencing and setbacks relative to the deed restrictions, which is handled during the design phase.

Municipal or County Permitting
Building permits (and sometimes separate electrical/plumbing permits) come from the city or county the property sits in, confirming the design meets building code, setback requirements, and safety-barrier rules. In unincorporated areas, this runs through county permitting rather than a city office; in incorporated cities (including, in the Memorial Villages case, several small independent cities), it runs through that specific municipal office.
HOA Architectural Review
Separately, HOA-governed communities typically require architectural review committee (ACC) or design review committee (DRC) approval, which looks at fence materials, setbacks relative to deed restrictions, and sometimes aesthetic guidelines beyond what the municipal code covers. This is a private community requirement, not a government one, and does not substitute for municipal permitting; most projects need both, not either/or.
Both processes are typically run during the design phase of a project so the pool is not held up mid-construction waiting on paperwork that should have been filed before the first excavation date.
FAQs
Can construction start before HOA approval is finalized?
Not advisably; starting before ACC/DRC sign-off risks being required to modify or even remove non-compliant work, which is why that approval is sought during design, before a build date is scheduled.
Do I need a permit for pool equipment replacement, not just new construction?
Often yes for electrical or plumbing work tied to equipment replacement, depending on the local jurisdiction and scope of work; worth confirming with the specific permitting office rather than assuming a repair is exempt.
Where This Fits
See our Gunite Pools service page, or Financing if cost is the next question.
Related Reading

How to Choose a Pool Builder
The practical questions worth asking before signing a pool construction contract, beyond just comparing price.

Pool Warranty: What It Actually Covers
Structural, equipment, and workmanship warranties are different things, here's how to tell them apart.

What to Ask During a Pool Site Evaluation
Questions worth having ready for the first walk of your property, so the visit is as productive as possible.
Get a Free Quote
Tell us about your project and we’ll follow up within one business day.